THE CEOS DATABASE : Missions, Instruments and Measurements
CEOS EO HANDBOOK – MISSION SUMMARY - HJ-1C -
Full Name Huan Jing-1C Status Mission complete
Mission Agencies CRESDA, CAST Launch Date 19 Nov 2012
Mission Links mission site EOL Date 01 Mar 2023
EO Portal Info NORAD Catalog # 38997 (TLE)
International Designator 2012-064A
Orbit Type Inclined, non-sun-synchronous Orbit Period
Orbit Sense Descending Orbit Inclination 97.3 deg
Orbit Altitude 499 km Orbit Longitude
Orbit LST 6:00 Repeat Cycle 31 days
Objectives and Applications Disaster and environment monitoring and forecasting. Small satellite constellation.
Mission Measurements
CategoryParameterInstrument(s)
LandAlbedo and reflectance S-Band SAR
Landscape topography S-Band SAR
Multi-purpose imagery (land) S-Band SAR
OceanOcean topography/currents S-Band SAR
Mission Instruments
S-Band SAR - S-Band Synthetic Aperture Radar
OpenSearch Datasets No IDN OpenSearch datasets found.

Want to explore more? Try FedEO by ESA or CMR OpenSearch by NASA
Copyright CEOS | About | Site Search | Report an Issue Researched and written by Symbios