CEOS EO HANDBOOK – MISSION SUMMARY
- GPM Core
-
|
Full Name
|
Global Precipitation Measurement Mission Core spacecraft
|
Status
|
Operational (extended)
|
Mission Agencies
|
NASA, JAXA
|
Launch Date
|
27 Feb 2014
|
Mission Links
|
mission site | data access portal
|
EOL Date
|
Sep 2026
|
EO Portal Info
|
|
NORAD Catalog #
|
39574 (TLE)
|
|
|
International Designator
|
2014-009C
|
|
Orbit Type
|
Inclined, non-sun-synchronous
|
Orbit Period
|
95 minutes
|
Orbit Sense
|
TBD
|
Orbit Inclination
|
65 deg
|
Orbit Altitude
|
407 km
|
Orbit Longitude
|
|
Orbit LST
|
|
Repeat Cycle
|
|
|
Objectives and Applications
|
3-year nominal mission life, 5-year goal. Study of global precipitation, evaporation, and the water cycle. The mission comprises a primary spacecraft with active and passive microwave instruments, and a number of ‘constellation spacecraft' with passive microwave instruments.
|
|
|
Mission Measurements
|
|
|
Mission Instruments
|
|
|
OpenSearch Datasets
|
No IDN OpenSearch datasets found.
No FedEO OpenSearch datasets found.
Want to explore more? Read about FedEO by ESA or click here to search FedEO or CMR OpenSearch by NASA
|
|