CEOS EO HANDBOOK – INSTRUMENT SUMMARY - LMX -
Full Name GeoXO Lightning Mapper Status Being developed
Instrument Agencies NOAA Maturity
Instrument Type Lightning sensors Geometry TBD
Instrument Technology Lightning imager Sampling Imaging
Data Access Data Format
Measurements and Applications
Resolution Summary
Swath Summary
Accuracy Summary
Waveband Summary
VIS (~0.40 µm - ~0.75 µm)
Instrument Measurements
Measurements Overview
CategoryParameter
Lightning DetectionTotal lightning density
Thematic Links Global Climate Observing System Essential Climate Variables (GCOS ECVs)
ECVDescriptionProduct(s)ECV Inventory 3.0 Record(s)
Lightning click here click here search ECV Inventory records
Instrument Missions
Geo-I1 - Geostationary Extended Observations Imager 1 (2032 - 2055)
Geo-I2 - Geostationary Extended Observations Imager 2 (2034 - 2055)
Geo-I3 - Geostationary Extended Observations Imager 3 (2039 - 2055)
Geo-I4 - Geostationary Extended Observations Imager 4 (2042 - 2055)