Mission Timelines

Timeline Type
Launch and Ordering
Total records: 8
Sentinel CIMR-A: 2030 - 2040 Sentinel CIMR-B: 2036 - 2046 METOP-SG B3: 2040 - 2048 METOP-SG B2: 2033 - 2041 METOP-SG B1: 2026 - 2035 HJ-2F: 2023 - 2031 HJ-2E: 2022 - 2030 HydroGNSS: 2025 - 2030 Sentinel CIMR-A: 2030 - 2040 Sentinel CIMR-B: 2036 - 2046 METOP-SG B3: 2040 - 2048 METOP-SG B2: 2033 - 2041 METOP-SG B1: 2026 - 2035 HJ-2F: 2023 - 2031 HJ-2E: 2022 - 2030 HydroGNSS: 2025 - 2030 CEOS Missions, Instruments and Missions Database
Data: CEOS MIM Database, CC BY 4.0. Attribution is required when the data are published or redistributed.