FY-3G Mission

Objectives and Applications

Rainfall measurement.

Mission Summary

Full Name
FY-3 Rainfall Mission 1
aka FY-3G, FY-3RM-1
Mission Status
Operational (nominal)
Mission Agencies
NSMC-CMA, CNSA
Launch Date
16 Apr 2023
Mission Links
EOL Date
Dec 2028
EO Portal Info

Orbit Details

Orbit Type
Inclined, non-sun-synchronous
Orbit Period
Orbit Sense
Orbit Inclination
Orbit Altitude
407 km
Orbit Longitude
Orbit LST
Repeat Cycle
NORAD Catalog #
International Designator

Mission Instruments

GNOS-2 - GNSS Radio Occultation Sounder-2
MERSI-RM - Medium Resolution Spectral Imager - Rainfall Measurement
MWRI-RM - Micro-Wave Radiation Imager for the Rainfall Mission
PMR - Precipitation Measurement Radar

Mission Measurements

CategoryParameterInstrument(s)
AtmosphereAtmospheric Humidity Fields GNOS-2, MERSI-RM, MWRI-RM
Atmospheric Winds MWRI-RM
Cloud type, amount and cloud top temperature MERSI-RM
Cloud particle properties and profile MERSI-RM
Liquid water and precipitation rate PMR
Atmospheric Temperature Fields GNOS-2
Gravity and Magnetic FieldsGravity, Magnetic and Geodynamic measurements GNOS-2
LandSoil moisture MWRI-RM
Vegetation MERSI-RM
OceanSurface temperature (ocean) MERSI-RM
Snow & IceSnow cover, edge and depth MWRI-RM

OpenSearch Datasets

No IDN OpenSearch datasets found.