Myriade Mission

Objectives and Applications

Tool for testing small payload instruments up to a mass of ~ 60 kg and to ~ 60 W of power, for short-duration missions (typically 2 years), with short development schedule and reduced costs.

Mission Summary

Full Name
Mission Status
Operational (extended)
Mission Agencies
Launch Date
29 Jun 2004
Mission Links
EOL Date
Jun 2030
EO Portal Info

Orbit Details

Orbit Type
Orbit Period
Orbit Sense
Orbit Inclination
Orbit Altitude
Orbit Longitude
Orbit LST
Repeat Cycle
NORAD Catalog #
International Designator

Mission Instruments

Mission Measurements

OpenSearch Datasets

No IDN OpenSearch datasets found.